LCM (Total Work = 100% Integer) Method

Instead of using 1/A + 1/B fractions, take the LCM of individual times as the Total Work (in units). Efficiency = Total Work / Time. Whenever a worker leaves or joins midway, simply subtract/add their exact units of work.

  • If A takes 12 days and B takes 15 days, Total Work = LCM(12, 15) = 60 units. A's eff = 5, B's eff = 4.
  • If A leaves 3 days before completion, ADD 3 days of A's work to Total Work and divide by (A+B)!
  • Wages are ALWAYS distributed in the ratio of WORK DONE (which equals efficiency ratio if they work for the same days).

MDH Chain Rule & Men-Women-Boys Problems

Work is proportional to Men × Days × Hours × Efficiency. Thus (M1 × D1 × H1 × E1) / W1 = (M2 × D2 × H2 × E2) / W2. For 'OR' vs 'AND' problems (e.g., 2M or 3W take 10 days; find 4M and 3W), convert everyone to one unit using the 'OR' equation.

  • If 2M = 3W, then M:W efficiency = 3:2.
  • In 'AND' equations (e.g., 4M + 6W take 8 days and 3M + 7W take 10 days), equate total work: 8(4M+6W) = 10(3M+7W).
ConceptFormula / RuleExample
Chain RuleM1·D1·H1 / W1 = M2·D2·H2 / W212 men × 8 days = 16 men × 6 days
Alternate DaysCompute 2-day cycle workA=4, B=3 -> 7 units in 2 days
Leaving Before EndAdd k×Eff to Total WorkA leaves 2 days before end -> +2A
Outlet PipeNegative efficiencyInlet +5, Outlet -3 -> Net +2

Pipes & Cisterns (Negative Efficiency)

Pipes and Cisterns is identical to Time & Work, except emptying/leak pipes have NEGATIVE efficiency. If a tank normally fills in 6 hrs but takes 8 hrs due to a leak, Leak efficiency = (Net - Inlet) = 3 - 4 = -1 unit/hr.

  • If inlet fills in A hrs and leak empties full tank in B hrs: Net time = AB / (B - A).
  • In alternate-hour pipe problems with an outlet pipe, stop 1 cycle BEFORE the tank overflows on the inlet's turn!